M

Your Community

E

Your Government

E

Your Services

E

Your Businesses

E

I Want To...

E
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Napoleon Lake South Development

Napoleon Lake South Development Plan Update Page

The Town has been working on creating a concept for land development on the green field site south of Napoleon Lake, located between 42 Street and 44 Street Crescent, west of 60A Avenue Crescent and east of Highway 54. The land was originally identified for future residential/commercial development in 1990 upon the adoption of the Napoleon Lake Area Structure Plan.

Vision: To create a successful vibrant neighbourhood center with the development of a mixed-use commercial center and walkable residential area that prioritizes pedestrian activity and movement, encourages community gathering and socialization between neighbours.

This page will be updated as the project progresses. Please check back from time to time to see:

  • updates on the project and where we are at in the process
  • materials to review and comment on
  • notices about opportunities for your participation.

To view the full presentation for the Napoleon Lake South Development, click here.

Napoleon Lake South area:

Six principles are applied in the concept development to achieve these objectives. Each principle responds to one or more objectives as shown in the diagram below.

Shared Residential Street Approach

The development is planned to support the area as a neighbourhood center with mixed-use commercial development towards 42 Street.

Our concept introduces a shared street approach in the residential strip with traffic calming measures that limits through traffic from the busier commercial stretch on the south.

  • Shared Street with chicanes at the entrance to the neighbourhood to limit vehicle traffic.
  • Carriage homes on the west residential strip
  • Attached or detached garages on the east residential strip.
  • Local main street design on the southern commercial end.

We intend to create a vibrant and walkable neighbourhood street next to the vibrant commercial street on the south. It may even absorb some commercial usage from the south and make space for live-work units or home-based businesses in the neighbourhood.

This concept proposes 59 units and an additional 13 laneway suites facing west towards the trail.

  • The street is proposed to have coloured paving, to enhance the pedestrian priority nature of the street.
  • Chicanes which are curved laneways at the end of the streets are used on the both entries, are used to slow down traffic going into the street.
  • On-street parking is provided and is demarcated with difference in paving, and planters are also provided to additionally define street parking.

We will have four types of residential lots in three residential land use zones – single detached with larger lots in the north, moving to south, another single detached with smaller lots alternating with duplex dwellings, and then town houses on the south end.

We attempt to preserve the community character by slow transition of housing types, setting a hierarchy in size and density of dwellings from low to high as we move down south towards the commercial area. Doing this, we provide housing of similar character and size near the existing neighbourhood.

Tell us what you think!

We are looking for community feedback about the proposed Napoleon Lake South Development!

Click here to fill out our online feedback form. Printed copies are available at the Town Office. Responses will be collected until 4:00 pm on October 21, 2024.

Will these homes negatively impact my property value?

“In general, new development increases home value in the long term (with a few exceptions) because new development usually means more opportunities to enrich the community.” – Turf Factory

More on ‘How New Development Affects Home Value’: https://turffactorydirect.com/blog/how-new-development-affects-home-value/?srsltid=AfmBOoogRaDo-3TfcOyAeoBVUwlYSGBjvkM2ROp3oo3rhZRPcRolvAQO

How will the Town deal with the potential of an increased crime rate because of the neighbourhood center?

The Town will respond to incidences of criminal or disruptive behaviour in the same manner it does in other areas of the community – a combination of municipal enforcement and RCMP.

Why can’t the town purchase property elsewhere?
  • Purchasing property requires budget from the Town.
  • The existing inventory of residentially zoned land is already present to support development.
When did these properties get zoned into residential? Why is residential being built in the green area?
  • The lands were originally identified for future residential/commercial development in 1990 upon the adoption of the Napoleon Lake Area Structure Plan.
  • The Land Use Bylaw adopted in 2009 identified portions of these lands as Residential Single Family District (R-1B) and Residential Single Family District (R-1C) and Public Use (P).
  • The 1998 Municipal Development Plan identified these lands as being a mixture of residential and open space.
  • The Land Use District Map from Land use Bylaw No. 1138/94 showed the subject property as being a mixture of Residential Single Family District (R-1B) and (R-1C) as well as Public Use (P).
What about the area designated as Public Use land? What will happen to the remaining green area?

The area designated as Public Use lands will be used for public use such as trails, tree plantation and park areas.

How long will this land be under construction?

There are many variables that will determine when or how long construction on this property may occur. A subdivision of this size could take up to two construction seasons to complete depending upon the availability of contractors, supply chain issues, labour availability, weather, etc. After that, the construction of individual dwellings will take time. A recent example is Bella Vista which still has vacant lots that were constructed a few years ago.

What is the purpose of taking examples (for shared street example) from outside Alberta and Canada?

The examples are intended to show the use of a shared street and not the density or the aesthetic of the development.

Does the commercial area of the site have a developer? Who are they?

The Town has entered into an agreement with a company for the first phase of the commercial component, a residential apartment building.

Will there be problems in development because of the high-water table level in this area?

A geotechnical analysis will be undertaken as part of the engineering review of the conceptual plan to determine the level of groundwater in the development area and to provide recommendations on the type of suitable foundations for the soil conditions, groundwater level and the need for sump pumps.

Will these new homes affect my taxes?
  • The new homes will be paying taxes to the Town but will not affect tax rates or assessment rates of existing homes.
  • In fact, the new development will help pay for future servicing of existing services that are underutilized in the area.

How much money has been spent on this concept so far?
  • The concept plan has been prepared as part of the Community Services department’s annual work plan. No outside consultants have been used in the preparation of this concept plan.
  • The Town has entered into a contract with Stantec Consulting to complete the detailed design and engineering for the project for a cost of $200,000. This work is funded from the Land Acquisition Reserve and will be recovered through any future land sales.
Will the shared streets and rear garages/parking create issues with parking and traffic congestion?
  • The land use bylaw requires each lot to have a minimum number of parking spaces within their lot depending on the number of residential units. Each dwelling unit must provide 2 on-site parking stalls with any secondary suites/laneway suites having to provide one additional stall.
  • The shared street has the same standard width as other residential streets in the rest of the town and will have street parking.
  • Additional parking will be provided for people accessing the proposed green space in the west.
Will there be architectural controls in the new subdivision?

Since the Town is directly involved in the development of the area, there is a potential to explore architectural controls to ensure the development is built as intended.

Are these affordable homes? Who defines what is affordable homes?
  • “In Canada, housing is considered “affordable” if it costs less than 30% of a household’s before-tax income. Many people think the term “affordable housing” refers only to rental housing that is subsidized by the government.” – CMHC
  • This development is intended to offer diverse housing types from single detached homes to apartment homes, with the intent to offer a broader range in housing prices for broader income ranges.
  • All lots are intended to be sold at market rates with preliminary estimates that lots would be sold between $60,000 (townhomes) to $130,000/lot.
Can we regulate if these homes will be owned or rented?

The Town uses its Land Use Bylaw to regulate the use of the land and not the users of the land. Hence, the Town does not regulate its users in any area in town.

How much tax revenue will come from these homes?

The Town will make revenue from selling residential lots as well as in the form of yearly taxes, which will add to the Town’s annual budget that helps serve the Town’s residents.

Detailed projections will be developed and provided to Council for their consideration prior to pursuing construction of the infrastructure. The revenue generated from the lot sales is intended to cover the costs of development.

Will the rear lanes be wide enough to allow increased traffic due to rear attached garages?

Yes, the lanes will be standardized and similar to lanes in other areas of the town with rear attached garages. Considerations to make the lanes wider will be made during the engineering detailed design phase to accommodate services or traffic.

What happens when the highway needs to be expanded in the future? Is the turning from Highway 54 to 42nd street safe?
  • Alberta Transportation owns approximately 62 meters right of way which is wider than the existing roadway with considerations in the case of expansion or servicing.
  • Alberta Transportation regulates and determines the requirement for intersection upgrades for provincial highways like Highway 54. As development progresses through this area and all surrounding areas traffic levels will be monitored and requirements for upgrades implemented. The cost of these upgrades would be negotiated between land developers, the municipality and Alberta Transportation.
What kind of screening will be placed to buffer noise and view of the highway?

Considerations can be made to plan for screenings to buffer noise from the highway in the detailed engineering phase of the development.

Does public feedback matter?

Administration organizes public consultation, notifies adjacent residents, collects feedback through various engagement methods to help improve the development concept in the next phases of planning. A public consultation report will be presented to the Council as well as made available to the public through a public town hall and the project webpage on the Town’s website.

If you have more questions about the project that are not listed on the pages, send us an email at ask@innisfail.ca. 

wpChatIcon
wpChatIcon